This design project developed out of a necessity for officer safety while dealing with a reduction in staff. This project required an updated electronic remote lock control for all cells that are managed by two new control rooms, one for each dayroom. The solution was applied to two facilities, each with four housing units. Raymond was engaged to develop construction documents for two control rooms in the SCDC housing units at Lieber CI and McCormick CI. The documents included Architectural, Structural, MEP, Security Electronics, and Fire Protection

South Carolina

SCDC Control Rooms and Locks

Other Projects