Raymond was retained by Fayetteville State University to perform an evaluation of the existing roof system. After our evaluation, we confirmed the Universitys determination that the roof required replacement. In addition to this, our team identified that the stone coping on top of the auditorium parapet was spalled in multiple locations and there was a need for secondary drainage as well as new roof access maintenance ladders. 

Fayetteville, NC

FSU Seabrook Auditorium

Other Projects