
The existing roof system (39,845 SF) at the ECU Science and Technology Building was composed of TPO single-ply membrane and polyisocyanurate insulation over concrete decking. Our team conducted field work to aid in bid document development, involving measurements, test cuts, and review of provided Infrared Imagery and Record Drawings. We performed nuclear meter readings to confirm wet insulation locations. Raymond prepared a narrative and cost estimate for ECU's decision-making. Plans and specifications were developed by Raymond for roof restoration, including removal of existing membrane and installation of new materials at Roof Areas A – E, along with flashings and other specified work.
Greenville, NC
ECU Science and Technology Building





