
Raymond engaged with the City of Durham’s Department of Water Management (DWM) to assist in survey and facility management for future site investment planning. Specifically, the effort involved surveying seventy-five (75) individual buildings, across five different locations, to determine the state of each roof system. Since the 2017 condition survey, Raymond has provided design and construction management services for 4 separate roof replacement projects totaling 57 buildings.
Durham, NC
Durham Water Management





